Turnkey construction in the Oulu region...WATCH OUT!

 Let me let you know about the wonderfulness of a primary-hand, not so a laugh, turnkey production from final summer time. I got here to research that now on the present day, which you cannot trust absolutely everyone these days. This tale takes place inside the rapidly developing residential vicinity of ​​the municipality south of Oulu, which is approx. 15 min. Driving distance from the middle of Oulu. And then to the matter itself...


A 12 months ago, within the spring, we have been searching out a new condo for our family and we noticed that a real property company in Oulu become promoting a super, now not but beneath production, semi-detached house in pre-advertising. 

We ordered brochures and were told that if the ground plan isn't always to our liking, the contractor is prepared to make changes to the rooms, since production had now not but started. We had been capable of mould the bottom to our liking and have been geared up to make deals. According to the brochures and the drawings supplied to us, the condominium had a dwelling vicinity of ​​approx. 

One hundred twenty five rectangular meters, an attic for storage, a warehouse and a storage, which turned into transformed into a roof. We made a verbal reservation for the condo with the contractor, and he become going to approve the modified pics with the municipality, after which we can make a small settlement, administrative division settlement and land sales.

Construction work on the web page commenced in early April. We visited the building every so often and things appeared to be progressing OK. At the end of May, the stone base became poured and the ground became poured on the equal time. This is wherein the issues started and there have been enough of them constantly after that...


After casting the stone footing and the floor, I commenced to look at the photographs, because consistent with my memory, inside the pics supplied to us, the foundation had to be completed in a regular manner, i.E. First the stone footing  Rakennusliike Oulu  is poured and in a later stage a 10 cm ground tile, however now the casting paintings become finished at the identical time, i.E. 

An facet-bolstered tile changed into made. I commenced to invite the contractor why this changed into the case, and he spoke back that the soil check required an side-reinforced slab and because of that there has been a deviation from the authentic photographs furnished to us. I were given the soil test protocol for myself and it changed into indeed the case, however... 

The check became completed about a year before we made the deal with the contractor and not anything changed into mentioned approximately it on the time of the deal. We agreed with the contractor that within the future the adjustments might be discussed earlier than whatever is carried out.


After noticing this case, I started out calling the municipality and asking what kind of cross-segment photos and photos in widespread the contractor has submitted to the municipality in connection with the permit applications, and I explained what has now come to mild. The municipal clerk turned into going to dig out the papers and call me.

 My phone rang and I heard a few quite thrilling things, the municipal reputable told me that there is not even a building on the plot yet, due to the fact the kick-off meeting hasn't been held, the accountable foreman (=supervisor) introduced via the organization has no longer been authorised due to incompetence, the municipality lacked drawings, and many others. 

I'm a little amazed, due to the fact there the constructing changed into already on the frame...I called the contractor to find out what all this means, he said to me: "Sleep in peace, our organisation will now not positioned a hoe inside the area until all the permits etc. Are so as." I known as the municipality's constructing inspector and he contacted the contractor, but the contractor were given over all of this by means of submitting the lacking snap shots to the municipality and hiring an outside constructing inspector and the water and sewer supervisor throughout the same day. 

In addition, the municipality changed into told the way to repair the bottom. The municipality turned into required to insulate the foundation with 50 mm finnfoam all through and cover it with a stone slab, and the 50 mm extra insulation planned for the inside of the walls need to be modified to the outside of the walls with a purpose to convey the partitions and stone footing to the equal degree. 

Once again, we had lively discussions with the contractor, however the unfortunate one didn't positioned the game off absolutely, however we continued the mission... However the contractor got out of all this via delivering the missing photographs to the municipality and hiring an outside constructing inspector and water and sewer supervisor at some point of the same day. 

In addition, the municipality changed into told how to restore the base. The municipality changed into required to insulate the muse with 50 mm finnfoam at some point of and cowl it with a stone slab, and the 50 mm additional insulation planned for the inside of the walls have to be changed to the out of doors of the partitions for you to carry the walls and stone footing to the same level.

 Once again, we had lively discussions with the contractor, however the unfortunate one failed to put the game off completely, however we continued the task... But the contractor got out of all this through turning in the lacking photographs to the municipality and hiring an external constructing inspector and water and sewer supervisor for the duration of the identical day.